Moore’s Creek-Subcontractor to Lucas Marine Construction

Type of Contract: Negotiated, Fixed Price

  • Date Awarded: June 2006
  • Customer: Lucas Marine Construction
  • Location of work: Fort Pierce, Florida

Click on a thumbnail to view the large images.

Description of work:

Install 115,000 SF Armorflex ABS system at various locations within the city’s drainage system. Scope: Survey, install erosion control & monitor, strip undesirable material from surface area, fill voids with engineered fill and compact, grade to line and specs, Place geotextile filter fabric, place ABS mats, grout around inlets and seams, grade embankment and top of slope to grade elevations, place fill into mats (blinding), & sod. Install new mitered ends around existing pipe inverts.