FPL-Sanford Cooling Pond

Type of Contract: Fixed Price

  • Date Awarded: April 2008
  • Customer: Florida Power and Light
  • Location of work: Sanford, Florida

Click on a thumbnail to view the large images.

Description of work:

Construction of drainage improvement system to power plant cooling pond. Installed seepage, surface drainage and sump systems. Five structures were installed at the levee base along a 1,200 acre reservoir. Sheet piling and dewatering was necessary. Work was performed in accordance with strict dam protection measures.