FPL-L31 Water Control Structure Installation

Type of Contract: Sealed Bid

  • Date Awarded: April 2007
  • Customer: Florida Power and Light
  • Location of work: Homestead, Florida

Click on a thumbnail to view the large images.

Description of work:

Install three concrete water control structures in environmentally sensitive areas of the FPL Everglades Environmental Mitigation Bank. Work around sensitive wildlife and fish habitat including salt water crocodiles. Excavate trench, install structures, intake & discharge pipes, backfill and compact. Install gates and place riprap around inlets and discharge of pipes. Place sod and water.